TY - GEN
T1 - Path Planning of a New Undersea Telecommunications Cable with Consideration of Crossing Angle with Existing Cables
AU - Wang, Xinyu
AU - Chen, Fahan
AU - Wang, Zengfu
AU - Wang, Tianjiao
AU - Moran, Bill
AU - Zukerman, Moshe
N1 - Publisher Copyright:
© 2025 IEEE.
PY - 2025
Y1 - 2025
N2 - Undersea telecommunication cables are critical components of the global infrastructure, with nearly every coastal nation connected via these "seabed highways."As of early 2025, there are over 600 active and planned undersea cables worldwide, spanning approximately 1.48 million kilometers and transmitting 99% of global internet traffic. Traditional manual path planning methods are inefficient and often result in suboptimal cable paths, making them difficult to account simultaneously for a range of natural factors and human activities that could impact cable cost and reliability. Notably, existing research overlooks planning guidelines recommended by the International Cable Protection Committee (ICPC), which emphasize minimization of proximity between new and existing cables. In this study, we introduce the ICPC-recommended cable crossing constraint into our previously developed automated route planning framework. Specifically, we adopt the Ordered Upwind Method to ensure that, when crossings are unavoidable, new cables intersect existing ones at an angle as close to 90° as possible. If a right-angle crossing is not feasible, a minimum angle of 45° is enforced. By incorporating this constraint into automated cable path planning, our approach aims to enhance the safety, maintainability, and long-term operability of both new and existing undersea cable systems.
AB - Undersea telecommunication cables are critical components of the global infrastructure, with nearly every coastal nation connected via these "seabed highways."As of early 2025, there are over 600 active and planned undersea cables worldwide, spanning approximately 1.48 million kilometers and transmitting 99% of global internet traffic. Traditional manual path planning methods are inefficient and often result in suboptimal cable paths, making them difficult to account simultaneously for a range of natural factors and human activities that could impact cable cost and reliability. Notably, existing research overlooks planning guidelines recommended by the International Cable Protection Committee (ICPC), which emphasize minimization of proximity between new and existing cables. In this study, we introduce the ICPC-recommended cable crossing constraint into our previously developed automated route planning framework. Specifically, we adopt the Ordered Upwind Method to ensure that, when crossings are unavoidable, new cables intersect existing ones at an angle as close to 90° as possible. If a right-angle crossing is not feasible, a minimum angle of 45° is enforced. By incorporating this constraint into automated cable path planning, our approach aims to enhance the safety, maintainability, and long-term operability of both new and existing undersea cable systems.
KW - cable crossing
KW - Ordered Upwind Method
KW - path optimization
KW - Undersea telecommunications cable
UR - https://www.scopus.com/pages/publications/105016250796
U2 - 10.1109/ICTON67126.2025.11125183
DO - 10.1109/ICTON67126.2025.11125183
M3 - Conference contribution
AN - SCOPUS:105016250796
T3 - International Conference on Transparent Optical Networks
BT - Conference Proceedings - 2025 25th Anniversary International Conference on Transparent Optical Networks, ICTON 2025
A2 - Cojocaru, Crina
A2 - Spadaro, Salvatore
A2 - Marciniak, Marian
T2 - 25th Anniversary International Conference on Transparent Optical Networks, ICTON 2025
Y2 - 6 July 2025 through 10 July 2025
ER -