Skip to main navigation Skip to search Skip to main content

Forecasting construction tender price index inm Hong Kong using vector error correction model

Research output: Contribution to journal › Article › peer-review

57 Citations (Scopus)

Abstract

Reliable short- to medium-term prediction of the tender price index (TPI) is crucial to construction stakeholders, and this has stimulated the interest of the research community to seek a more analytical method for TPI forecast. The purpose of this study is to establish an econometric model for accurately predicting the tender price movements based on a group of associated financial and macroeconomic variables. Applying Johansen's method for multivariate cointegration analysis, the tender price was found to be cointegrated with the gross domestic product, construction output and building cost. A vector error correction (VEC) model imposing the cointegration restriction was then developed for the purpose of forecasting. The model was verified against various diagnostic statistical criteria and compared with the Box-Jenkins and regression models. With a mean absolute percentage error for a three-year ahead forecast at 2.9% level, the developed VEC model outperforms the Box-Jenkins and regression models, and is proven to be efficient and reliable in forecasting the short- to medium-term tender price movements. The model can assist estimators to predict the TPI pattern in advance, and it can also help the public sector in planning for the construction workload to improve the stability of the construction market. Although the VEC model developed focuses on the Hong Kong construction market, the econometric technique can be applied to modelling other economic variables.

Original languageEnglish
Pages (from-to)1255-1268
Number of pages14
JournalConstruction Management and Economics
Volume28
Issue number12
DOIs
Publication statusPublished - Dec 2010
Externally publishedYes

Keywords

  • Cost estimate
  • Econometric modelling
  • Forecast
  • Tender price index
  • Vector error correction model

Fingerprint

Dive into the research topics of 'Forecasting construction tender price index inm Hong Kong using vector error correction model'. Together they form a unique fingerprint.

Cite this