TY - GEN
T1 - Applying ant colony system to solve construction time-cost trade-off problem
AU - Zhang, Yanshuai
AU - Ng, S. Thomas
AU - Kumaraswamy, Mohan M.
PY - 2007
Y1 - 2007
N2 - Time-Cost Trade-off (TCT) is a very common problem in the construction domain. The concept of TCT is to minimize either the total cost or total duration of a project at a predetermined construction duration or amount respectively. Many techniques have already been proposed for solving the TCT problems, and examples of these include the heuristic methods, mathematical approaches and evolutionary-base optimization algorithms (EOAs). Among these techniques, the EOAs such as the genetic algorithms, ant colony optimization, particle swarm algorithms, etc. are considered more promising for TCT due to their ability to cope with the dynamic behaviour and their efficiency. The Ant Colony System (ACS), being an extension of the basic ant colony optimization algorithms, has good potential for solving network problems like TCT due to its excellent ability to identify the best path of a network. In this paper, an ACS model for discrete TCT problems is introduced. Having developed the model in Visual Basic and integrated with Microsoft Project, a series of computational experiments is conducted to compare the performance of the proposed ACS model with other previous developed methods. The performance and weakness of the ACS model for TCT problem is highlighted to conclude this paper.
AB - Time-Cost Trade-off (TCT) is a very common problem in the construction domain. The concept of TCT is to minimize either the total cost or total duration of a project at a predetermined construction duration or amount respectively. Many techniques have already been proposed for solving the TCT problems, and examples of these include the heuristic methods, mathematical approaches and evolutionary-base optimization algorithms (EOAs). Among these techniques, the EOAs such as the genetic algorithms, ant colony optimization, particle swarm algorithms, etc. are considered more promising for TCT due to their ability to cope with the dynamic behaviour and their efficiency. The Ant Colony System (ACS), being an extension of the basic ant colony optimization algorithms, has good potential for solving network problems like TCT due to its excellent ability to identify the best path of a network. In this paper, an ACS model for discrete TCT problems is introduced. Having developed the model in Visual Basic and integrated with Microsoft Project, a series of computational experiments is conducted to compare the performance of the proposed ACS model with other previous developed methods. The performance and weakness of the ACS model for TCT problem is highlighted to conclude this paper.
KW - Ant colony system
KW - Project management
KW - Time-cost trade-off problem
UR - https://www.scopus.com/pages/publications/84877605465
M3 - Conference contribution
AN - SCOPUS:84877605465
SN - 9780415460590
T3 - CME 2007 Conference - Construction Management and Economics: 'Past, Present and Future'
SP - 1227
EP - 1233
BT - CME 2007 Conference - Construction Management and Economics
T2 - 25th Inaugural Construction Management and Economics: 'Past, Present and Future' Conference, CME 2007
Y2 - 16 July 2007 through 18 July 2007
ER -