Skip to main navigation Skip to search Skip to main content

Analysing costs of material acquisition for construction projects

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

1 Citation (Scopus)

Abstract

Materials are important in every construction project as they attribute to a significant proportion of total costs. Because of this, planners and managers should carefully plan and control the ordering, distribution and storage of materials, i.e. the logistic process. Among various available project data, the cost of material acquisition can serve as an indicator to show the efficiency of logistic process. The research devises a material management tool by reference to the acquisition cost. In the proposed model, the delivery of materials is linked to the construction schedule to establish the determinant variables affecting the material acquisition costs viz. the delivery cost, storage cost and direct cost of material. Working start time and distribution times are selected as the determinant variables. With GAs (genetic algorithms) tools as simulation method, it is found that just in time delivery and a suitable construction schedule can lead to lower material acquisition costs.

Original languageEnglish
Title of host publicationCME 2007 Conference - Construction Management and Economics
Subtitle of host publication'Past, Present and Future'
Pages765-772
Number of pages8
Publication statusPublished - 2007
Externally publishedYes
Event25th Inaugural Construction Management and Economics: 'Past, Present and Future' Conference, CME 2007 - Reading, United Kingdom
Duration: 16 Jul 2007 → 18 Jul 2007

Publication series

NameCME 2007 Conference - Construction Management and Economics: 'Past, Present and Future'

Conference

Conference25th Inaugural Construction Management and Economics: 'Past, Present and Future' Conference, CME 2007
Country/TerritoryUnited Kingdom
CityReading
Period16/07/07 → 18/07/07

Keywords

  • Acquisition cost
  • Construction material
  • Genetic algorithms
  • Material logistics

Fingerprint

Dive into the research topics of 'Analysing costs of material acquisition for construction projects'. Together they form a unique fingerprint.

Cite this